NSSDCA ID: XXNO-00558
Availability: At NSSDC, Ready for Offline Distribution (or Staging if Digital)
Time span: 1973-05-28 to 1974-02-08
The ATM mission operation log is a chronological listing of the operations of the solar instruments on the ATM/Skylab between days-of-year (DOY) 148 (May 28, 1973) and 404 (Feb. 8, 1974). Its purpose is to provide rapid access to the detailed operation of the instruments on the ATM and to aid each ATM principal investigator in correlating the as-flown operation of his instrument with those of other ATM instruments. The original log was contained in five volumes of hard copy supplied by the Ball Brothers Research Corp. Volume 1 contains manned and unmanned portions of the SL-2 mission (DOY 148 - 209). Volume 2 contains manned portions of the SL-3 mission (DOY 209 - 244). Volume 3 contains manned and unmanned portions of the SL-3 mission (DOY 244 - 320). Volume 4 contains manned portions of the SL-4 missions (DOY 320 - 360). Volume 5 contains manned portions of the SL-4 mission (DOY 360 - 404). The primary source of data for the log was the Harvard College Observatory (HCO) compressed user tapes. Additional information concerning individual instrument operation was supplied for each of the PIs. The data are contained on microfiche.
Questions and comments about this data collection can be directed to: Coordinated Request and User Support Office
Name | Role | Original Affiliation | |
---|---|---|---|
Mr. D. A. Roalstad | General Contact | Ball Aerospace Systems Division |